|
|
|
OUR
KIT – Swimming Pool :
|
What
our competitors are offering :
|
|
1
|
Structure
|
zinzimire
thickness approximately
2
mm
|
Steel
sheet thickness 0,75 mm
Only
folded steel sheet
|
|
2
|
Sheet
assembly
|
Interlock
only
|
60
kg of bolts and screws
|
|
3
|
Height
of sheet
|
1,50
Metres
|
1,1
Metres or 1,20 Metres
|
|
4
|
Liner
|
Liner
resistant in a push of 3 tons of water ,M², 10 years warranty
on all the structure , 10 times more resistant
|
Thickness
of 0.75
mm and not an all the surface
|
|
5
|
Armed
and contrived fabric
|
Setting
all
year round
|
Setting
when temperature is 20°
|
|
6
|
Filtering
wall with micro particles and double filtration
|
With
cartridge
|
With
cartridge
|
|
7
|
Assembly
|
BASE
WITHOUT CONCRETE - 36 Hours
|
WITH
CONCRETE
(base thickness minimum 10 cm, DTU standard) put rubble stone for
superior height of 1.10 M – 10 Days
|
|
8
|
Time
for concrete
to dry
|
ZERO
(NO CONCRETE)
|
40
days - DTU
Standard
|
|
9
|
Base
of the swimming pool
|
FLAT
BOTTOM
due to the height of the sheets Height 1,50 Metres : ideal
position for the swimmer
|
A
‘spoon’ bottom because of less height
: 1,10 metres will be very EXPENSIVE in stake in work
|
|
10
|
Warranty
without accessories
|
10
Years COMPLETE on waterproofness with 20 Years of recession of
longevity on the liner
|
10
Years graded on liner with 10 % loss every
year, life expectancy 9 Years Max
|
|
|
|
OUR
KIT – SWIMMING POOL :
|
What
our competitors are offering :
|
|
|
|
EXAMPLE
1 – SWIMMING POOL
dimensions 8,00Mx4,00Mx1,50M
|
EXAMPLE
1 – SWIMMING POOL dimensions
7,50Mx3,80 Mx1,20M
|
|
1
|
You
receive your swimming pool
|
On
the 15th
of April knowing that the excavation works are done.
|
On
the 15th of April knowing
that the excavation works are done.
|
|
2
|
Diverse
|
Preparations
and implementations
according to explanations
|
Preparations
and implementations
according to explanations
|
|
3
|
Service
|
Without
edges
/ tiles and staircases and without exterior amenagement
|
Without
edges
/ tiles and staircases and without exterior amenagement
|
|
4
|
Swimming
on the
|
30th
of April
– No matter the weather report
|
30th
of April -
BEWARE !! Concrete is still drying and liner needs to be fixed
|
|
|
|
EXAMPLE
2 –
SWIMMING POOL WITH SAME DIMENSIONS
|
EXAMPLE
2 – SWIMMING POOL
WITH SAME DIMENSIONS
|
|
1
|
You
receive your swimming pool on the
|
15th
of October, excavation done
|
15th
of October, excavation
done
|
|
2
|
Diverse
|
Preparations
and implementations
according to explanations
|
Preparations
and implementations
according to explanations
|
|
3
|
Swimming
on the
|
5th
of November if
weather forecasts allows
|
NO
SWIMMING UNTIL SPRING
(CONCRETE IS DRYING)
|
|
4
|
IF
YOU WISH TO HEAT YOUR POOL
|
Possible
insulation on panels steel with isolating plates
|
It
will
depend on the company and according to your case, but the price
remains dissuasive
|