Phone

Email

Comparatif

10 comparative and interesting points between:



OUR KIT – Swimming Pool :

What our competitors are offering :

1

Structure

zinzimire thickness approximately

2 mm  

Steel sheet thickness 0,75 mm

Only folded steel sheet

2

Sheet assembly

Interlock only  

60 kg of bolts and screws  

3

Height of sheet

1,50 Metres  

1,1 Metres or 1,20 Metres

4

Liner

Liner resistant in a push of 3 tons of water ,M², 10 years warranty on all the structure , 10 times more resistant 

Thickness of 0.75 mm and not an all the surface


5

Armed and contrived fabric

Setting all year round 

Setting when temperature is 20°

6

Filtering wall with micro particles and double filtration

With cartridge  

With cartridge

7

Assembly

BASE WITHOUT CONCRETE - 36 Hours  

WITH CONCRETE (base thickness minimum 10 cm, DTU standard) put rubble stone for superior height of 1.10 M – 10 Days

8

Time for concrete to dry

ZERO (NO CONCRETE)  

40 days - DTU Standard

9

Base of the swimming pool

FLAT BOTTOM due to the height of the sheets Height 1,50 Metres : ideal position for the swimmer  

A ‘spoon’ bottom because of less height : 1,10 metres will be very EXPENSIVE in stake in work

10

Warranty without accessories

10 Years COMPLETE on waterproofness with 20 Years of recession of longevity on the liner

10 Years graded on liner with 10 % loss every year, life expectancy 9 Years Max

BUT ALSO



OUR KIT – SWIMMING POOL :

What our competitors are offering :



EXAMPLE 1 – SWIMMING POOL dimensions 8,00Mx4,00Mx1,50M  

EXAMPLE 1 – SWIMMING POOL dimensions 7,50Mx3,80 Mx1,20M

1

You receive your swimming pool

On the 15th of April knowing that the excavation works are done.

On the 15th of April knowing that the excavation works are done.

2

Diverse

Preparations and implementations according to explanations


Preparations and implementations according to explanations


3

Service

Without edges / tiles and staircases and without exterior amenagement  

Without edges / tiles and staircases and without exterior amenagement  

4

Swimming on the

30th of April – No matter the weather report 

30th of April - BEWARE !! Concrete is still drying and liner needs to be fixed



EXAMPLE 2 – SWIMMING POOL WITH SAME DIMENSIONS  

EXAMPLE 2 – SWIMMING POOL WITH SAME DIMENSIONS  

1

You receive your swimming pool on the

15th of October, excavation done  

15th of October, excavation done  

2

Diverse

Preparations and implementations according to explanations

Preparations and implementations according to explanations

3

Swimming on the

5th of November if weather forecasts allows 

NO SWIMMING UNTIL SPRING (CONCRETE IS DRYING)

4

IF YOU WISH TO HEAT YOUR POOL

Possible insulation on panels steel with isolating plates

It will depend on the company and according to your case, but the price remains dissuasive